Skip to content

FREE SHIPPING ON ALL ORDERS OVER $200USD (~800 ZŁ) - SHOP NOW 📦

Magnum Long Lead EDC Knife

Original price 124.00 zł - Original price 124.00 zł
Original price
124.00 zł
124.00 zł - 124.00 zł
Current price 124.00 zł

📦 In stock - Usually dispatched within 24 hours

The Magnum Long Lead EDC is a classic pocket knife for gentlemen and gourmets for everyday use. Its simple, slightly curved design immediately catches the eye. The no-frills design also matches its technical design as a slide knife that has proven itself millions of times thanks to its ease of use and fewer components. The satin-finish blade made of 8Cr13MoV stainless steel is flat ground, opened with a fingernail. bwz lock. Slightly contoured grip covers made of textured G10 fit comfortably in the hand. With a clip.

Technical data

Blade steel: 8Cr13MoV
Total length: 184mm
Blade length: 80mm
Blade thickness: 3.0mm
Libra: 78g
Blockade: slipjoint
Handle: G10
Clip: Yes